As electric vehicles arrive on Egyptian roads, the attention naturally lands on the chargers themselves. But a charging point is only the last meter of a much longer electrical story.
The load behind the socket
A cluster of fast chargers can add a substantial, spiky load to a local network. Without proper distribution, protection, and load management upstream, that demand degrades power quality for everyone else on the feeder.
Designing for the network, not the plug
MBI approaches EV infrastructure the way it approaches any distribution challenge: from the supply side down. Correctly rated boards, protective coordination, and metering come first — the charger is specified into a system that can actually carry it.
That's how charging networks scale from a handful of pilot points to something a city can rely on: by treating the grid connection as the product, not an afterthought.